
Professional Roof Installation in Blue Ash, OH
The old roof comes off into our Equipter, the deck is checked, and new Owens Corning shingles go on with ice and water shield at the edges and valleys.

A full tear-off and a new Owens Corning shingle roof, most finished in one day, with a SWORD project manager on site.
We're a family-owned roofing and siding company with an office in Blue Ash. Roof replacement is our signature service, and we install shingle roofs only.
We're an Owens Corning Preferred Contractor, and we install Owens Corning shingles exclusively. We'd rather explain a roof than sell one, so you'll see photos and hear the reasoning before you see a price.

Everything a shingle roof needs, from the deck up.

The old roof comes off into our Equipter, the deck is checked, and new Owens Corning shingles go on with ice and water shield at the edges and valleys.

We size intake and ventilation for the roof, not just lay shingles. A roof without good air movement cooks from the inside out.

We also repair roofs, handle storm damage, and replace skylights and gutters while the roof is being done. Gutters are 25% off when bundled with a roof.
A new roof is more than a new top layer. Here is what we put down, in the order it goes on, and why each piece is there.
Once the old shingles are off, we can see the wood they were nailed to. About one home in five that we re-roof needs new sheathing, and some older homes have spaced boards that need OSB laid over them before shingles can go on.
This is a stronger, self-sealing underlayment. We run it along the roof edges and in the valleys, and around pipes and vents as well. Code calls for it to reach 24 inches past the interior wall. It wasn't required about 15 years ago, so roughly 35% to 45% of the roofs we tear off have none.
A strip of metal flashing at the edge of the roof. It keeps water off the fascia board, sends it into the gutter, and stops it from wicking back up under the first row of shingles.
Owens Corning Duration shingles have a woven strip across the nailing zone. It gives the installer a clear line to hit, which helps prevent the three mistakes that shorten a roof's life: nailing too high, nailing too low and driving the nail too deep. It also improves the wind rating and the seal between shingles.
Outside air has to come into the attic low and leave high. We work out how much ventilation your roof needs instead of guessing, which is part of our Owens Corning Top of the House certification.

Standard on every replacement we do.
We offer three Owens Corning shingles, and only three. Think of them as good, better and best.
The entry-level architectural shingle in the lineup and the lowest price of the three.
The shingle most homeowners choose. It has the SureNail strip in the nailing zone.
Our top option. Duration FLEX is UL 2218 Class 4 impact-resistant, which matters here because wind and falling limbs cause most of the storm damage we see. It has the SureNail strip too.

Most homeowners have no idea what a roof costs, and some expect a number several times too high. So here it is. A standard 15-square roof, which is about 1,500 square feet of roof surface, runs about $10,000 to $14,000 when no wood needs replacing.
Pitch is the first thing: a steep roof takes longer and needs more safety gear. The second is how cut-up the roof is. Every valley, hip and dormer means more cutting, and the waste factor on shingles runs from 5% to 15% depending on the shape. Then come the accessories, such as skylights, chimney flashing and brick counter-flashing, and the number of old layers that have to come off.
When accessible, we inspect attic spaces to limit the amount of surprises on the price. We don't always have access to the attic, whether that's because the homeowner wasn't there or there's just no access door to get in it, and in those situations it's a to-be-determined. But if we can get in the attic, we're getting in and we're letting you know the condition of your sheathing. When a roof does need a full re-deck, it averages $4,000 to $6,000.
Most of our customers finance. Financing is through Service Finance Company, with flexible financing options and a standard 18-month program. You can also pay by cash or check, or through insurance when storm damage justifies a claim.

Your project manager arrives first. Their first job is confirming that the right shingle, in the right color, was delivered.

Old shingles go straight into the Equipter at the roof edge instead of onto your lawn and shrubs.

Deck repairs, underlayment, flashing and shingles go on, with the project manager checking the details.

We haul the debris, run a magnetic sweep for nails, and take the finished drone photos.
Our Blue Ash office is at 6824 Ashfield Dr, Suite 200, and the office team is in Monday through Friday, 8AM to 5PM.
From here we serve Blue Ash and the communities around it, including Montgomery, Sharonville, Kenwood, Evendale and West Chester.

Ask any roofer these before you sign, including us.

A new shingle roof asks very little of you. We don't sell maintenance plans, because a new roof doesn't need one for its first eight to ten years, and it doesn't need an inspection for at least five.
Two habits are worth keeping. Clean the gutters, so water leaves the roof the way it should. And after a windy night, walk around the house and look up.
You'll have the drone photos of the finished roof for your records. They are useful if you sell the house, and useful if a storm ever raises the question of what the roof looked like before.
A standard 15-square roof with no wood replacement runs about $10,000 to $14,000. If the decking needs replacing, a re-deck averages $4,000 to $6,000. When we can get into the attic, we inspect the sheathing first so there are fewer surprises.
When the shingles have lost most of their granules and a repair would cost about 15% of a new roof. Exposed matting and bare fiberglass are the late signs we check for.
We educate instead of hard selling, a project manager runs every job, we document the work by drone, and we finish most roofs in a day.
Most of our roof replacements are finished in one day.
Owens Corning shingles. We offer Oakridge, TruDefinition Duration and TruDefinition Duration FLEX, and we'll walk you through what each one costs.
We look at how much life the shingles have left and what the repair would cost. You'll get both options when both make sense. Our Blue Ash roof repair page explains how we decide.
Yes, and it's the easiest moment to do it. Gutters are 25% off when you bundle them with a roof replacement. See Blue Ash gutter installation.
Yes. Our Blue Ash office is at 6824 Ashfield Dr, Suite 200. We also have a main office on the east side of Cincinnati.
Our Blue Ash office is at 6824 Ashfield Dr, Suite 200. The office team is in Monday to Friday, 8AM to 5PM.
The inspection and estimate are free, and you can get a ballpark online in about a minute.
Rated 4.9 on Google. Read our reviews